TBD Projects

Transportation Benefit District

 

The Transportation Benefit District (TBD) is a quasi-municipal corporation and independent taxing district created for the sole purpose of acquiring, constructing, improving, providing, and funding transportation improvements within a City or district. The City of Sequim established the Sequim TBD in 2008. In July 2009, the voters approved funding for TBD projects for a period of ten years by way of an increase in sales tax (.2%). The TBD is a separate entity from the City and an organizational structure was established, policies adopted, and projects identified. The types of TBD projects include:

 

  • Annual Safety Maintenance and Operations: Pavement markings, crosswalk striping, sidewalk repair, sign maintenance and signal operation and maintenance, street lighting operation and maintenance, and vegetation control.
  • Road Preservation: Pavement overlays, crack sealing, shoulder maintenance, drainage and storm sewer maintenance.
  • Road Improvement Projects: New construction associated with capacity and safety improvements, including, but not limited to widening, channelization, sidewalk installation, signalization and drainage improvements.

Following are some of the TBD projects that have been completed since 2011:

14 th Avenue_thumb.jpg                         Crew lays down new crosswalk_thumb.jpg

South 14th Avenue Roadway/Sidewalks Construction           City crew laying down crosswalks


Del installing LED lights_thumb.jpg                           DSCN5079_thumb.jpg
City crew converting to LED lighting                                        Dungeness Way Shoulder Repair


DSCN5086_thumb.jpg                           DSCN5088_thumb.jpg
N. 4th Avenue Pavement Rehabilitation                                   S. 7th Avenue Overlay


DSCN5106_thumb.jpg                           DSCN5108_thumb.jpg
Purchase of Bike Racks                                                             City Wide LED Light Conversion


E. Fir Street Pedestrian_thumb.jpg                           N. 3rd Sidewalks_thumb.jpg
E. Fir Street ADA Improvements                                               N. 3rd Avenue Sidewalk Construction


N. 7th Ave._thumb.jpg                            S. 3rd Ave. Pathway 1_thumb.jpg
N. 7th Avenue ADA Improvements                                             S. 3rd Avenue Pathway Construction


S. Sequim Ave_thumb.jpg                            W. Sequim Bay Road_thumb.jpg
S. Sequim Avenue ADA Improvements                                     W. Sequim Bay Road Overlay


The list of TBD projects are as follows:

    Year

 Project

           

 Description

           

2011

14th Avenue Street/Sidewalk 

Construction of Roadway/Sidewalk

2011

River Road

Pavement Overlay

2012

Purchase of Bicycle Racks

City Wide Bicycle Racks

2012

N. 3rd Avenue Sidewalks

Construction of Sidewalks/Ramps

2012

S. Sequim Avenue Pavement

Pavement Rehabilitation/Ramps

2012

Transportation Master Plan (TMP)

Engineer Consultant of TMP

2012

West Sequim Bay Road

Pavement Overlay

2012

N. 7th Avenue

Pavement Rehabilitation/Ramps

2013

2013 Pavement Rehabilitation

Pavement Rehabilitation

2013

2013 ADA Sidewalk Improvements

ADA Ramp Reconstruction

2013

S. 3rd Avenue Pathway

Pathway Construction

2014

E. Fir Street Pedestrian Improvements

ADA Ramp Reconstruction/ODT Designation

2014

Signal Engineering-Fir/Sequim

Signal Engineer to warrant Traffic Lights

2014

LED Light Conversion

LED Light Conversion

2015

2015 Pavement Preservation Project

Pavement Rehabilitation