Rehabilitation of existing wet well, replacement of existing lift station with package lift station equipped with 2-100 gpm, 25 hp non-clog centrifugal pumps, and installation of flow meter and vault, automatic transfer switch and other electrical upgrades, electrical panel shelter and pole lighting and permanent backup power. Services south/southwest areas of Bell Hill (Highland Hills development) and pumps to gravity sewer on Fox Hollow Rd.